A trenchless repair is organized and quick. Here is a typical day, from arrival to final video.
Arrival and setup
The crew confirms the plan, marks access points and protects work areas.
Cleaning and prep
The pipe is jetted and cleared so the new liner or pipe has a clean path.
The repair
We install the liner, or pull the new pipe through the old path, from the access pits.
Curing and reconnecting
The liner cures, then side connections are reopened with a robotic cutter.
Final camera check
We run a camera through the finished pipe and show you the result.
Cleanup
Access areas are closed, tools are removed and the site is left tidy. You will have working plumbing again, usually the same day for lateral lining.